The design and execution of few floors are completed while other floors design is in process. Other documents related to the project.Įxpected duration A minimum of 6-months with possibility of extension depending on needs and funding availability.ĭuties and Responsibilities The United Nations Economic and Social Commission for Western Asia (UNESCWA) building, located at UNESCWA premises in Beirut Lebanon, is under renovation. Scope of Work for the systems integration, which is to be included in the RFP for the second phase of this project. Technical standard specifications for utility panels (bulkheads), cables, connectors and other materials. Generic technical specifications for all equipment and systems, including a sample available on the market that meets the specification in equivalent provided. Infrastructure specification including cable management, architectural and electrical requirements as an enhancement to the existing system, taking into consideration the preservation of the historical architecture of the building. Set of all single-line drawings required for integration phase of the project (detail design functional) such as: audio, video, lighting, control, CMSI, custom GUI layout, network topology, room and equipment layout and elevation, ergonomic and side line drawings. List of specifications on how the system is to be wired and tested. List of all applicable standards (industry and local codes) to be met by the design and systems integration company.

Overall estimated system integration budget (equipment, material and labour), indicating line items for equipment, installation, commissioning, training, warranty and other project elements. Acustic and ligting design for each AV room. Conceptual block diagram, functional lay out for each identifted AV room. Signal flow diagram, including applied timing and referencing methodology. Result of Service Complete system design and related project documentation shall be delivered including, but not limited to, the following: